- Stationary
- Batch mixing
- 60–400 t/h
Stationary Batch Asphalt Plant
RMX-B60 ~ RMX-B400
Asphalt producers and contractors running one site for years, with many mix recipes and strict specifications.
Asphalt mixing plants and practical support for road projects worldwide

Cold winters, a short paving season and overland delivery from China shape plant choices in Central Asia. Here is how we configure plants for the region.
Covering: Uzbekistan · Kazakhstan · Kyrgyzstan · Tajikistan · Turkmenistan
Planning
Bitumen tanks, pipes and pumps need insulation and heating so the plant can start reliably in cold mornings early and late in the season. We discuss winterization options with you.
With fewer paving months, the plant has to deliver more tonnes per day. We size output and storage so the season’s tonnage can be produced in time.
The region is landlocked, so plants travel by road or rail from China. Container-sized units simplify loading and border crossing.
Hot summers and cold winters call for suitable lubricants, sealing and electrical protection across a wide temperature range.
Recommended
RMX-B60 ~ RMX-B400
Asphalt producers and contractors running one site for years, with many mix recipes and strict specifications.
Why here: City suppliers and long highway contracts that need high daily output and many recipes.
RMX-C80 ~ RMX-C400
Contractors who move between projects or export plants overseas and still need batch-level mix accuracy.
Why here: Container-sized units travel overland easily and set up without foundations.
RMX-R80 ~ RMX-R160
Road owners and contractors with a steady supply of milled asphalt who want to lower material costs.
Why here: For road owners with regular milling who want to reuse old pavement in new mix.
Logistics
Support
Yes. Insulated and heated bitumen tanks and lines, and suitable lubricants and electrical protection, can be included. Tell us the lowest temperatures expected during the working season.
Overland from China by road or rail. Container-sized units make loading and border crossing simpler.
Work out the total tonnage needed in the season, divide by the realistic number of working days and hours, and add storage for peak demand. Send us your figures and we will propose a model.
Send us the output you need, your site location, fuel options and the route to site. We will reply with a suggested configuration and quotation.