The short answer
For Cameroon, a containerized or mobile batch plant of 80–120 t/h is the usual starting point for corridor sections; a stationary plant suits a base near Douala or Yaoundé. See the containerized plant, the mobile plant and the stationary batch plant.
Cameroon at a glance for plant buyers
| Topic | What to know | What it means for the plant |
|---|---|---|
| Paved network | 10,576 km at end-2024: 8.6% of 121,873 km | Large unpaved share |
| Target | 6,000 km extra by 2030; 384.95 km paved by 30 Sep 2025 | Programme behind schedule |
| Funding | About 100 bn CFA for 2025 against a gap over 900 bn | Pace set by funding |
| Corridors | Douala–N’Djamena; Douala–Yaoundé highway phase 2 | Large packages on main axes |
| Power | 50 Hz | Generator where the grid is weak |
What the figures say
Ministry of Public Works data reported in the press put the paved network at 10,576 km on 31 December 2024, or 8.6% of a 121,873 km network; the end-2023 figure was 10,225.58 km (8.39%). The national strategy calls for 6,000 km of additional paved roads, about 600 km a year, but only 384.95 km had been paved by 30 September 2025 against an annual target of 754.76 km; the 2026 aim is nearly 650 km. A September 2025 review found 91,405 km in disrepair, and the 2025 campaign had about 100 billion CFA francs against a funding gap above 900 billion. The Ngaoundéré–Garoua section (242 km) of the Douala–N’Djamena corridor is under reconstruction, and work began on phase 2 of the Douala–Yaoundé tolled highway.
Choosing the plant
| Job | Starting point |
|---|---|
| Corridor section | Containerized RMX-C120 |
| Maintenance and repairs | Mobile RMX-M80 |
| Base near Douala or Yaoundé | Stationary batch RMX-B160 |
Rain and humidity
Equatorial rain wets aggregate year-round in the south: cover stockpiles and size the dryer for real moisture (hot, humid climate guide). Douala is the main port; check the road route and bridges for the heaviest piece.
Next steps
Send us your section, tonnage and fuel and we will propose a configuration.