The short answer
For Mozambican road contracts, a containerized or mobile batch plant of 80–120 t/h is the usual starting point, with a generator and spare parts for remote sections. The containerized plant and mobile plant move between lots; a stationary plant suits a commercial base.
Mozambique at a glance for plant buyers
| Topic | What to know | What it means for the plant |
|---|---|---|
| Paved share | Nearly 80% of the network unpaved (ANE deputy director) | Large unpaved backlog |
| Programme | Mais Estradas 2031: 3,219 km in 45 sections to be paved | Many lots, long timeline |
| Damage | Heavy rains damaged almost 14,000 km of roads (2024 report) | Repair work as well as new paving |
| Example | Niassa: 693 km paved of 3,983 km | North has long distances |
| Power | 50 Hz | Generator where the grid is weak |
What the figures say
An ANE deputy director has said nearly 80% of the network is unpaved. The Mais Estradas 2031 programme plans to pave 3,219 km across 45 sections by 2031, and ANE has begun selecting supervision firms with 36-month contracts; ANE’s wider plan covers more than 3,500 km of rehabilitation and construction. A 2020–2024 target had been 1,200 km of national and regional roads. A 2015-era assessment counted about 30,121 km of roads, of which 22,700 km classified, which is dated. Niassa has only 693 km paved of 3,983 km. I found no official 2024 national paved total.
Choosing the plant
| Job | Starting point |
|---|---|
| Programme lots of tens of km | Containerized RMX-C120 |
| Repairs after rains | Mobile RMX-M80 |
| Commercial plant near Maputo or Beira | Stationary batch RMX-B120 |
Ports, rain and cyclones
Plants arrive at Maputo, Beira or Nacala, then travel long distances by road. Plan the heaviest piece against bridge and axle limits (shipping checklist). Cyclone and rainy seasons stop work, so cover aggregate and plan production for the dry season.
Next steps
Send us your section, tonnage and fuel and we will propose a configuration.
Sources: ANE statements reported by Logistafrica and Club of Mozambique (2024–2026); AllAfrica (May 2024); Roads for Water assessment (about 2015).