The short answer

For Tanzanian road contracts, a batch plant of 80–160 t/h is the usual starting point — containerized or mobile for contractors who move between regions, stationary for a commercial base.

Tanzania at a glance for plant buyers

Topic What to know What it means for the plant
Network TANROADS: 37,734.41 km, of which 12,225.26 km paved (May 2026 budget speech) Much unpaved road still to upgrade
New asphalt 243.13 km built July 2025–April 2026 Steady demand, spread across regions
Other agency TARURA manages rural and urban roads (about 144,430 km per TANROADS’ Dec 2025 report) Many small and medium contracts
Port Dar es Salaam; Nelson Mandela Road expansion planned (construction expected ~2027) Container-sized modules; plan the inland route
Climate Rainy seasons in much of the country (confirm for your region) Dry the aggregate; plan paving windows
Power 50 Hz; confirm voltage by site 50 Hz motors; generator where the grid is weak

What the figures say

Tanzania’s Works Minister reported in May 2026 that the national network under TANROADS stands at 37,734.41 km, with 12,225.26 km upgraded to asphalt, and that 243.13 km of asphalt roads were built from July 2025 to April 2026. Other reports give different totals (a Daily News piece cites about 16,000 km of paved roads nationally), which probably reflects different scopes. For a tender, ask the agency for its own figures.

For Dar es Salaam, TANROADS plans to widen Nelson Mandela Road between the Kijazi Interchange and the Nyerere (Kigamboni) Bridge to eight lanes, with construction expected to begin in 2027; I found no confirmed progress beyond procurement, so treat the schedule as a plan.

Choosing the plant

Job Starting point
Upgrade of regional roads, several lots Containerized RMX-C120
Maintenance across regions Mobile RMX-M80
Commercial plant near a city Stationary batch RMX-B120

Rain and moisture

Wet aggregate cuts drum output, so cover stockpiles and size the drum for the wet-season moisture — see production in the rainy season.

Next steps

Send us your tonnage, region and fuel and we will propose a configuration.

Sources: Works Minister’s budget speech (May 2026); TANROADS report (December 2025).